You don't have javascript enabled. Good luck with that.
Pencarian
 PT MRT Lakukan Pengujian Persinyalan dan Listrik Dipo MRT
.
photo Wuri Setyaningsih - Beritajakarta.id

PT MRT Conducts Signal and Electric Test at Lebak Bulus Depot

The mass rapid transit developer PT MRT Jakarta conducts MRT train signal and electric test at Lebak Bulus Depot, South Jakarta. It is conducted using two trains.

This test is done for two days, precisely since June 4-5, 2018

"This test is done for two days, precisely since June 4-5, 2018," expressed William Sabandar, Director of PT MRT Jakarta, Tuesday (6/5).

Besides that, his side also conducts static test on two MRT train lines at the depot. "The static test is done by moving the train forward and backward," he said.

PT MRT Jakarta to Use CBTC Signaling System

After this, his side would conduct the same trial on the main line.

"After the test is completed, Directorate General of Railways for Transportation Ministry will certify it in the forthcoming December," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1507 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye929 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye431 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye411 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye399 personFolmer