You don't have javascript enabled. Good luck with that.
Pencarian
 PT MRT Lakukan Pengujian Persinyalan dan Listrik Dipo MRT

PT MRT Conducts Signal and Electric Test at Lebak Bulus Depot

The mass rapid transit developer PT MRT Jakarta conducts MRT train signal and electric test at Lebak Bulus Depot, South Jakarta. It is conducted using two trains.

This test is done for two days, precisely since June 4-5, 2018

"This test is done for two days, precisely since June 4-5, 2018," expressed William Sabandar, Director of PT MRT Jakarta, Tuesday (6/5).

Besides that, his side also conducts static test on two MRT train lines at the depot. "The static test is done by moving the train forward and backward," he said.

PT MRT Jakarta to Use CBTC Signaling System

After this, his side would conduct the same trial on the main line.

"After the test is completed, Directorate General of Railways for Transportation Ministry will certify it in the forthcoming December," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati